Bid Opening Report, Federal-Aid Highway Construction Contracts, First Six Months 2001



Publisher: s.n. in [S.l

Written in English
Published: Downloads: 853
Share This

Edition Notes

ContributionsUnited States. Federal Highway Administration
ID Numbers
Open LibraryOL14523695M

AB & J Construction Co., F.2d (5th Cir. ), a general contractor solicited a bid from a subcontractor for earthwork and piping. After reviewing the bid, the general contractor asked the subcontractor to verify its bid. The subcontractor did so and submitted a new bid $30, higher than its prior bid. The general. The table below is a partial list of these recently published government contracts and bids. You can search the Bid Contract database to find more government bid solicitations in road work, roadwork, road construction, roadway construction, road improvement, highway construction, highway work, street construction, street work, bridge, bridges. Under the federal rules governing bids and contracts, a proper, enforceable bid guarantee is a matter of bid responsiveness – the bid of a contractor that fails to include a valid bid bond at the moment of bid opening must be rejected by the government (FAR ). Non-Construction Contracts – CDBG grant is less than $, ____ 6. 10 days prior to construction bid opening recipient called OBDD to “Lock-In” The recipient submitted an OBDD review Section 3 plan prior to the first draw for non-construction activities. Chapter 5 – Procurement & Section 3 Grant Management Handbook ()

(Book) - This is the first volume of NCHRP Report Guidance for Implementation of the AASHTO Strategic Highway Safety Plan, a series in which relevant information is assembled into single concise volumes, each pertaining to specific types of highway crashes (e.g., run-off-the-road, head-on) or contributing factors (e.g., aggressive driving). Public Opening: All bids must be opened publicly at the time and place stated in the invitation for bids. The public is allowed at that time to review the bids. Selection and Contracting: A firm-fixed-price contract award must be made by written notice to the responsible bidder whose bid, conforming to the invitation for bids, is lowest. Wilson Blvd., Suite Arlington, VA General Inquiries: () AGC Store Inquiries: () Main Office Fax: () This project is partially funded with federal-aid highway funds, and is subject to the requirements for participation of Disadvantaged Business Enterprises (DBEs) set forth in 49 CFR Part Therefore, there may be a goal set for participation of DBEs in this contract. If there is a DBE contract goal, it will be shown in Section 1 below.

See § Contract Bonds. 6. Bid Security. Every bid must be accompanied by a bid bond, certified check or bank cashier's check payable to the NYS Department of Transportation, in the sum of the amount shown on the proposal title page. Bonds must be on form CONR Electronic bids must include an electronic bid bond. 7. New York State Can. by approving officials. For example, of the 29 contracts GAO reviewed in-depth, 6 were longer than 3 years. As the figure below illustrates, an Army bridge contract for computer support services was initially planned as a month bridge, but because of subsequent bridges, ultimately spanned 42 months. The FHWA is amending its regulation on project agreements. Section of the Transportation Equity Act for the 21st Century (TEA) amended 23 U.S.C. (a) and combined authorization of work and execution of the project agreement for a Federal-aid project into a single action. Changes to the.   PROPOSAL AND CONTRACT DOCUMENTS FOR THE CONSTRUCTION OF (EXEMPT) 16 Rehabilation of US Highway 90 Bascule Bridge, known as Maintenance Project No. MP() / , in the County of Harrison, State of Mississippi. Project Completion: Ma BIDDERS MUST PURCHASE A BOUND PROPOSAL.

Bid Opening Report, Federal-Aid Highway Construction Contracts, First Six Months 2001 Download PDF EPUB FB2

Contract Provisions for Federal-aid Construction and Service Contracts Required by FHWA or Other Agencies; FHWA National Review of State Cost Estimation Practice .pdf, 1 mb) Construction Program Guide - Selected Contract Administration Topics (Provides applicable statutes, regulations, policy memos, guidance and other related information).

COVID Resources. Reliable information about the coronavirus (COVID) is available from the World Health Organization (current situation, international travel).Numerous and frequently-updated resource results Bid Opening Report available from this ’s WebJunction has pulled together information and resources to assist library staff as they consider how to handle coronavirus.

The term Federal-aid highway does not include roadways functionally classified as local roads or rural minor collectors. NONDISCRIMINATION The provisions of this section related to 23 CFR Part are applicable to all Federal-aid construction contracts and to all related construction subcontracts of $10, or more.

The. Federal-Aid Highway Program The competitive bidding requirement of 23 U.S.C. § imposes, in addition to procedural rules dictating the process by which bids are awarded, a substantive limitation on state or local bidding requirements that are unrelated to the bidder’s performance of the necessary work.

COMPETITIVE BIDDING AND AWARD OF HIGHWAY CONSTRUCTION CONTRACTS. The basis, purpose and essential principles of competitive bidding are reviewed, and competitive bidding requirements for federal and federally aided highway construction contracts are examined.

and the effect of bid mistakes in contract awards are also covered. It is noted. contract for the construction work. The agency received seven bids, including G & J’s, by bid opening on October The apparent low bid was rejected as nonresponsive; G & J’s bid was second low.

The president of G & J had purportedly signed G & J’s bid in three places--lines 20B. •The Puerto Rico Highway and Transportation Authority (PRHTA) is the recipient Agency of Federal-Aid Funds and responsible for carrying out the duties required by law.

•PRHTA is using the federal funds for: •Construction Projects •Planning Activities •Consultant Services Contracts •PRHTA’s Construction Engineering and Design. Contract Management VIII-1 BID PACKET FOR CONSTRUCTION CONTRACTS SAMPLE FORMS This does not represent all of the required content of the bid packet.

It only provides sample forms. Example: the wage determinations, plans and specifications, maps, etc. are not included here, but must be a part of the total bid packet. Advertisement for Bids. bid openings for fiscal year july 1, – j bid opening project number project title estimate 12/03/ fo furnishing and delivering one (1) 5,lb.

capacity forklift to the daniel k. inouye international airport, honolulu, hawaii 12/03/ fo_fo furnishing articulating boom lifts at daniel k. inouye international airport, honolulu, hawaii [ ]. Infederal, state and local government agencies spent nearly $ billion on construction projects.

The majority of these funds paid for roads and related infrastructure, as well as sewage treatment plants, school construction and water facilities; however, annual government construction spending at all levels generates many opportunities for vendors in construction.

PRIOR TO BID OPENING: The contractor shall have a current active license from the Oregon Construction Contractors Board. If required by the bid documents, contractors may also be required to attend a pre-bid conference. Contractors also are expected to be aware of, and base their bids upon, all addenda that might be issued prior to bid opening.

(6) A firm, fixed-price contract award shall be made by written notice to the responsible bidder whose bid, conforming to the invitation for bids, is lowest. The contract may provide for an incentive payment to the contractor for an early completion.

(c) A Sponsor or Borrower may award a negotiated, noncompetitive construction contract. CONSTRUCTION CONTRACTS. The following general federal provisions are a part of this Contract and do not require submittal of additional documentation, forms, reports, or certifications, except in unusual circumstances.

Interest of Members of Local Public Agency. No member of the governing body of. Subscribe now for full access to construction projects. Subscribe to to get access the largest and most trusted source of construction projects in North America.

Overlocal, regional and national projects out-for-bid are added to our database annually. Obtain direct access to thousands of active local, state and federal government bids and awards listings, customized to meet your business needs and sent to you daily by email.

This report covers (1) what is known about the prevalence of bid shopping on federal construction projects and (2) what tools the federal government has to monitor and address contractor performance.

GAO judgmentally selected and reviewed construction contracts from three of the four federal agencies that obligated the most funds for. (Applicable to all Federal-aid construction contracts and to all related subcontracts of $, or more.) By submission of this bid, or the execution of this contract or subcontract, as appropriate, the bidder, Federal-aid construction contractor, or subcontractor, as appropriate, will be deemed to have stipulated as follows.

Sincehighway infrastructure spending has begun to increase again; but some of this increase can be attributed to a rise in the cost of construction labor and materials. Ina total of $ billion was spent on highway and water infrastructure, $ billion of which came from state and local government, with $ billion for capital.

The Federal-aid accounts must be promptly adjusted and appropriately credited to reflect the Federal pro-rata share of such refunds.

Therefore, establishing an escrow account for settlement from bid rigging cases as proposed by the Colorado Department of Highways is not satisfactory.

that there is not a reasonable time still available before bid opening to notify bidders of the modification and a report of the finding is inserted in the contract file (29 CFR (c)(3)). Standard EEO Specifications – Pages 30 ‐ 33 Notice of Affirmative Action – Pages 34 ‐ 36   PROPOSAL AND CONTRACT DOCUMENTS FOR THE CONSTRUCTION OF (EXEMPT) 10 Overlaying Mississippi Highway 15 at Fork Road in Philadelphia, known as Federal Aid Project No.

STP() /in the County of Neshoba, State of Mississippi. Project Completion: 43 Time Units Electronic addendum updates will be posted on. The database has thousands of construction, electrical and roadwork related bids, contract and RFP opportunities to help build your business. Last year alone, we published overbids in your specific industry!Whether it's new construction, renovation, or supplies and materials you are looking for, the latest opportunities are right at your fingertips.

CONSTRUCTION OF FEDERALLY FUNDED (FEDERAL AID) LOCAL AGENCY PROJECTS BY NON-COMPETITIVE BID CONTRACT (FORCE ACCOUNT) June The Code of Federal Regulations (CFR) Ti partand 23 CFR (b), allow federal aid construction work to be completed by a method other than competitive bidding. Bid Tabulations.

Bid tabulations show the amount bid by each bidder for each pay item in a contract. They are posted as soon as the Contracting Officer certifies that a bid tab accurately reflects the bids received and publicly opened. Fiscal years run from October 1. Moreover, the Federal-Aid Road Act ofwhich created the Federal-Aid Highway Program, also had authorized $ 1 million per year for 10 years for forest roads, trails, and bridges.

As work with the NPS declined, BPR eliminated its parks and. After the Bid Deadline has passed, gather the accumulated bids, check them with the bid tabulation form, and take them to the place of the bid opening.

Withdrawal of Bids After the Bid Deadline Informal bids may be withdrawn prior to the Bid Deadline by the person or firm submitting the bid.

The period of performance shall not exceed 60 months from the effective date of the contract. The NAICS Code for this effort is with a size standard of $11 Million. This procurement is a re-compete of an existing multiple award IDIQ issued under solicitation DTFHR and awarded to the following ten contractors with an.

CDOT does not accept paper bids for Highway and Bridge Construction projects. All bid proposals for the construction projects must be submitted electronically via Bid Express. For help with Bid Express, please contact a customer service representative ator at [email protected].

A responsive bid is one that materially complies with the form or content requirements of the bidding documents. Material irregularities in a bid may not be waived and make it nonresponsive (see ).

The Bid Form Check-Off List is designed to assist the Facility in determining if a bid is responsive (see and ). Bidder Notification. ] HIGHWAY CONSTRUCTION The Federal-Aid ffighway Construction Process: Procedures, Cases, and Plaintiff Strategies The demand for modem highways has risen sharply.

To meet this surging need, Congress in enacted the Federal-Aid Highway Act.l In so doing the nation embarked upon a massive twenty-year program. York City Local Law 19 (Local Law 19).' Section of the Federal Aid Highway Act ofas amended, 23 U.S.C. §requires the Secretary to withhold approval for contracts for locally administered highway construction projects funded in whole or in part by the federal government unless the contracts are awarded through competitive bidding.Applies to Federal -aid highway projects on the National Highway System (NHS) Essential to FHWA project approval • Estimate of financial obligation • Evaluation of bids for unbalancing • Comparison basis for award Estimate accuracy tracking FHWA goal - EE +/ % of low bid 50% of time Guidelines on Preparing Engineer's Estimate, Bid.The Equal Opportunity Construction Contract Specifications set forth under 41 CFR and the provisions of the American Disabilities Act of (42 U.S.C.

et seq.) set forth under 28 CFR 35 and 29 CFR are incorporated by reference in this contract.